FAQ

Frequently Asked Questions

1. What is a super built-up area, built-up area, and carpet area?

Carpet Area is the total usable area inside the house that can be covered by Carpet. The carpet area excludes the balcony and other utility areas but does include the area covered by internal walls.

Built-up Area is the sum of carpet area plus the area covered by the balcony, terrace, and other utility as well. The Super built-up area is the total sum of the built-up area and space occupied by common areas like lobby, staircase, elevator, shafts, clubhouse. This is often referred to as a saleable area.

2. What are the quality checks that you perform on the site?

We have our very own and few outsourced QASCON Checklist with 310+ Quality Checks. You can refer to the Quality section of the website.

3. Is Everything included in the package?

Not all houses require most of the things, however Borewell, Plan Sanction, BESCOM Approval, BWSSB Approvals, Transformer (If required), Power Back up, Lift, solar water Heater and Interior is not included and will be charged as per the price which will be informed to you.

4. What happens if I want different brand of materials other than the one's in the packages?

We give you the best quality and best work as per the package you choose. However, if you want it from the different brand, we will consider it and if there is any extra charges, we will notify you the same.

5. Will these packages cover my approvals if needed?

We assist our clients in the approval process through the Construction Professionals onboarded on the platform. We are not directly involved in the approval process but our partners ensure that the clients get a completely hassle-free experience.

6. Approximately how long does it take to complete construction of one floor?

It takes about 5 months for the first floor and another 1.5 months for every floor beyond that. Duration also varies depending upon the built-up area, location, design complexity etc.

7. Does we provide loans as well?

We do assist the clients with the documentation part for the loan approval process. We have also partnered with a couple of banks and NBFCs for attractive interest rates.

8. Does we Include the interior with the construction and provide the complete package?

There are separate packages for interior works if you wish to get the interiors done at competitive prices. We do have collaborated with few Interior designing companies and if you require, we will send you the catalogue to choose your designs.

9. What if the prices of the materials increase when the project is ongoing. Would there be a price escalation?

The pricing of our contracts is frozen on a stamp paper. Hence, the prices remain stable in most of the scenarios. Only in exceptional situations where there is a sudden spike in prices due to external circumstances, the price variation is to be paid by the client. On the other hand, if there is a price drop, clients get a price reduction for the same

10. What are the major factors on which house construction cost depends?

Construction cost of a house majorly depends upon the Super built-up area, Open area (ie Balcony, Utility), Quality of Construction material, and Interiors. We provide various packages at different prices to suit your needs.